Last Planner System

YA
9 Feb โ€” 20 Mar
Status:
Can Do
In Progress
Constraint
Trade
Week 1
9 Feb - 13 Feb
Week 2
16 Feb - 20 Feb
Week 3
23 Feb - 27 Feb
Week 4
2 Mar - 6 Mar
Week 5
9 Mar - 13 Mar
Week 6
16 Mar - 20 Mar
Structure

Rebar placement โ€” Ground Floor

Ground Floor

Concrete pour โ€” 1st Floor

1st Floor

Post-tension stressing โ€” 2nd Floor

2nd Floor

Curing & strip โ€” 3rd Floor

3rd Floor

Predecessor
MEP Rough

HVAC duct routing โ€” Ground Floor

Ground Floor

Plumbing rough-in โ€” 1st Floor

1st Floor

Electrical conduit โ€” 2nd Floor

2nd Floor

Fire sprinkler main โ€” 3rd Floor

3rd Floor

Drywall

Sanding โ€” Ground Floor

Ground Floor

Metal framing โ€” 1st Floor

1st Floor

Equipment

Board installation โ€” 2nd Floor

2nd Floor

Taping & mud โ€” 3rd Floor

3rd Floor

Information
MEP Finish

Testing & balance โ€” Ground Floor

Ground Floor

Panel termination โ€” 1st Floor

1st Floor

HVAC diffusers โ€” 2nd Floor

2nd Floor

Fixture trim-out โ€” 3rd Floor

3rd Floor

Flooring

Tile layout โ€” Ground Floor

Ground Floor

Grout & seal โ€” 1st Floor

1st Floor

Transition strips โ€” 2nd Floor

2nd Floor

Subfloor prep โ€” 3rd Floor

3rd Floor

Permit
Paint

Primer coat โ€” Ground Floor

Ground Floor

First coat โ€” 1st Floor

1st Floor

Equipment

Second coat โ€” 2nd Floor

2nd Floor

Material

Touch-up & punch โ€” 3rd Floor

3rd Floor

Equipment
Finishes

Ceiling grid โ€” Ground Floor

Ground Floor

Ceiling tile โ€” 1st Floor

1st Floor

Door hardware โ€” 2nd Floor

2nd Floor

Labor

Signage install โ€” 3rd Floor

3rd Floor